Affordable SEO and Web Design: West Cheshire and Chester - For real value, High quality, Custom and CMS website production, SEO and Design and more!
Home Find MeOther stuffPhotographyTarvin RefurbTell me about you
AA
Bathroom
Bedroom 1
Bedroom 2
Bedroom 3
Dining Room
Garden
Hall & Landing
Kitchen
Lounge
Other rooms
Tarvin Refurb






bathroom header

This was the second room which we refurbished as it was another room which is heavily used and in which we spent a lot of time. As you can see, we had a little problem when one of the teeth on the pipe cap which we fitted rusted and started dripping water into the cavity above the kitchen! This room took us over 6 months to complete and currently (May 2009) is the most expensive:

  • Removed old furniture
  • Removed radiator
  • Removed old gloss paint from walls
  • Removed artex coating from ceiling
  • Removed old power shower, pipework, power supply and pull-cord
  • Removed old woodwork: door frame, skirting and architrave
  • Installed new shower
  • Rotated bath 180°
  • Fitted new taps to bath which match new sink taps
  • Installed new pop-up waste in bath
  • Tiled floor to ceiling including tumbled travertine marble mosaic border
  • Installed new morden woodwork
  • Installed halogen downlighters
  • Installed silent, PIR activated, ducted extractor
  • Moved light switch from pull-cord in bathroom to new matching switch outside
  • Installed new, brushed steel shaver socket
  • Fitted new beech, space-saving furniture
  • Installed new silent, water-saving toilet
  • Fitted new dual-fuel towel rail
  • Fitted glass sail shower screen
  • Laid new slate-effect tile floor